Manufacturing Capabilities
From raw copper tube to finished, performance-tested heat pipe — every critical process happens inside our own 6,000+ m² plant in Shenzhen’s Pingshan District.
Our Four Workshops
- Sintering workshop — wick fabrication, the heart of heat pipe performance
- Automatic necking workshop — tube end forming for charging and sealing
- Automatic spot welding workshop — hermetic sealing integrity
- Testing workshop — performance verification before anything ships
Process Flow
- Copper tube forming & precision cutting
- Wick insertion / sintering
- Charging & secondary sealing
- Bending, flattening & end forming
- Performance testing & outgoing inspection
Test & Laboratory Equipment
- Automatic Qmax test stations — maximum heat transfer capacity verification
- Power (performance) testing machines — in-production sampling
- Helium shock / pressurization testing — hermeticity and leak detection
- Thermal shock chambers — reliability under repeated thermal cycling
What We Need From You
- OD × length × wall thickness
- Wick preference and working orientation
- Qmax target and temperature limits
- Bend radii, flattening thickness, end treatment
- Estimated annual volume
OEM / ODM
We build to print. For new projects, our engineers advise on flattening limits and bend feasibility before you freeze the design — cheaper than finding out after tooling.